Inverkiething bay comes alive with activity.

Forth guardsman and Scot venture worked simultaneously in the bay by the JLW team
Wilson dyna also loading out scrap at Robertson metals

Robertson metal and JLW solutions operations along with Plans being proposed in the same week for the old Preston field quarry site, all bringing the area some well deserved new life blood and gains for the local community.

https://www.dunfermlinepress.com/news/19426371.inverkeithing-prestonhill-quarry-plans-include-new-pier-water-taxis-bistro

There is a buzz of activity in Inverkiething bay with our efforts at JLW solutions at the very hart of it, our on going work with Balfour Beatty’s Dalgety bay remediation project and the Forthbridge stevedores constant drive to keep with the current high demand for construction timber, sees the JLW team performing at there best and the most vessels I’ve seen in the bay in my lifetime possibly even since the scrapping of all the war vessels.