On the 7th day of Christmas

Power washed ahead of entering the JLW workshop.

At Clydebank Port Services we use the trackstacker together with a JLW developed feeder hopper to offload bulk general cargo vessels and conveyour the material to the store or stock piles. With the failure of a track motor the decision was made to put it through the JLW solutions workshop for a well deserved overhaul.

JLW solutions team do what there are good at bringing this great piece of kit back to an operational standard. Well done to all involved.