Forth logistics vessel maintenance.

JLW Solutions’s and forth logistics are in deep water again, with the early morning preparations to set up the vessel cradle, we taking advantage of the large tide, then it is a waiting game.

Once the tide returns the vessel is guided over the cradle with the aid of position markers either side of it. At this point the heavy work begins.

Great photo as we wait with the three iconic forth crossings in the back drop.

The New Holland T7 200 makes light work pulling the 40+ ton vessel up the slow concrete slipway, assisted by the old faithful forth logistics Land Cruiser used on a second line as a brake.