JLW team are drafted in to assist with multiple planned maintenance jobs while the entrance lock area is dried out,

/home/wpcom/public_html/wp-content/blogs.dir/d64/40788492/files/2014/12/img_7149.jpg

/home/wpcom/public_html/wp-content/blogs.dir/d64/40788492/files/2014/12/img_7114.jpg
A particularly dirty and challenging task to find and expose a structure along the dock floor, then remove it to allow dredging work in the future to be carried out without obstruction.