On the 16th day of Christmas 2020

Tine repairs with Strenx 700 performance steel done in a timely fashion in readiness for our next vessel. Looks good team well done.

On the 15th day of Christmas 2020

Thing are getting wet wet wet… On the home farm our own wet challenge with flood water washing drift material down stream creating a back up in the drainage system.

On the 14th day of Christmas 2020

JLW solutions design, build and modification efforts are put to work for Mcfaydens transport, yet another bespoke project solution for the wind turbines transport giants.