2019 Enercon wind turbines at ABP Ayr

ABP Ayr have a particularly busy week, the dock is a hive of activity with general cargo with the addition of these two wind turbine vessels, the Northern rock and the Western rock delivering Enercon equipment.

Whytes crane hire coordinate the discharge and storage of all the components in readiness for delivery to site.

JLW solutions provide experience slinger and crane controller support to the Whytes team to driving the project forward where ever possible.

West of Scotland transport with there wealth of experience of this type of work, conducting the internal dock transport of the massive pieces from ship to lay down area.

JLW Solutions provide drivers and our heavy haulage Scania tractor unit assists West of Scotland with there task of moving these heavy pieces. Great team effort and a pleasure.